Boats

Sign in
All boats

1992 Pacific Seacraft 37 "Equanimity", Sausalito, California

7/21
1992 Pacific Seacraft 37 "Equanimity"View listing

Ability analysis

Everything below is costed to cross the Pacific.

Archived on August 27, 2026. Everything researched about it is still here; it sits under Archived on the boats list rather than in the comparison.

Specifications

All-in, cruising

—

not analysed

All-in, offshore

$227k–$289k

offer + full refit

Length

36.92 ft

Draft

5.83 ft

Capability

6.6 · 6.7

cruising · offshore, of 10

Capability is scored for both standards from the same design research, re-weighted. The money is not: a coastal refit has to be costed on its own, which is why it can read “not analysed” above while the score beside it is real.

Assistant's read — an opinion, not a source

  • This is a genuinely proven compact offshore design already in the San Francisco Bay Area, with unusually strong model-level seakeeping, good access to machinery, and a credible recent-maintenance story.
  • Compared with the prior payload, the engine line should not be treated as an expected repower without a failed specialist inspection: the listing now documents 2,875 hours, regular List Marine care, a 2023 cooling-system rebuild, and almost $15,000 spent on the engine in 2023-2024, so I have reduced repower probability and added engine inspection/baseline service instead.
  • The main economic threats are now verification items: the draft conflict, 2015 standing rigging and sails reaching 13 years by March 2028, the 2015 LeisureFurl system, possible aluminum fuel-tank corrosion, and any deck/core or rudder findings from survey.

Costed to cross the Pacific.

Finance

Offer$109,000
$54kasking $109k

At the asking price. Drag down to model a lower offer.

Sign in to change the offer.

Likely refit cost
$117,788

each line × its odds

Holding / yr
$13,607

slip $6k · ins $2k · tax $1k

All-in departure cost
$227k–$289k

offer + full refit

Worst case, every line landing in full: $180,383. Planning figure is the likely cost above; this is the tail, not the expectation.

Resale

The gross figure flatters: Australian duty and GST fall due on sale, and brokerage is charged on the sale price.

Expected resale

$144k

in Australia, gross

AU duty + GST

$17k

on sale, not arrival

Brokerage

$14k

on the sale price

Recouped value

$113k

what actually comes back

Taxes and brokerage, total

$44k

incl. $11k CA use · $1k CA property/yr

All-in after resale

$166k–$210k

cash gone once sold in AU

DIY savings

$59 an hour of your own time, blended. Not folded into any total above — every figure on this page assumes the yard does the work.

Labour saved

$20k

across 15 jobs · $14k more must go to a pro

Hours of your time

345 hrs

about 22 weekends

Where the money goes

  • Purchase $109k
  • Use tax $11k
  • Refit $96k
  • Risk $24k
  • Unknowns $21k
  • Holding $18k
  • AU import $17k
Purchase
$109,000

contemplated offer

CA use tax
$10,900
Required refit
$71k–$154k

10 items still unpriced

Risk, expected
$23,760

8 open · $353k if all hit

Unknown reserve
$21,192

systems not yet looked at

Holding
$18,142

slip $8k · insurance $3k · tax $2k

Cash to Pacific-ready
$228k–$372k
All-in by Australia
$255k–$399k
Net after resale
$166k–$210k

assumes $144k resale

Where to open

Suggested opening offer$20,884

Asking price less $88,116 — the negotiable share of $123,100 in disclosed and suspected defects plus $23,760 of weighted risk. Offshore upgrades are excluded on purpose: a watermaker and a liferaft are your ambition, not the seller's problem, and the next buyer wanting a Bay daysailer would pay near the ask.

Negotiable defects
$88,116

from $123,100 of defect work

Weighted risk
$23,760

8 still open

Max at high case
$34,856

the ceiling, never an offer

Schedule

A boat that cannot be ready is not cheaper, it is a year late.

ready in 33 weeks45 weeks spare

How much of this is actually known

A boat priced from guesses is a different risk from one priced from quotes, at the same total.

Costs actually quoted0%
Systems assessed0%