2003 Beneteau Oceanis 42CC "AFFINITY", Alameda, CA (Richard Boland Yachts)
View listingAbility analysis
Everything below is costed to cross the Pacific.
Specifications
—
not analysed
$226k–$234k
offer + full refit
43.5 ft
5.92 ft
5.4 · 5.5
cruising · offshore, of 10
Capability is scored for both standards from the same design research, re-weighted. The money is not: a coastal refit has to be costed on its own, which is why it can read “not analysed” above while the score beside it is real.
| Item | Cost estimate | Probability | Priority | Product | What and why | Range | Notes |
|---|---|---|---|---|---|---|---|
| $10,800 | |||||||
Replace all standing rigging, wire and terminals, including unstep and re-step | $13,500 $0$38k | 80%$10,800 weighted into totals | blocks | — | — | $9k–$21k | — |
| $1,430 | |||||||
Fit a dedicated trysail track to the mast and fully service the in-mast furler | $2,600 $0$9k | 55%$1,430 weighted into totals | — | — | — | $1k–$5k | — |
| $1,760 | |||||||
Renew halyards and primary sheets | $2,200 $0$7k | 80%$1,760 weighted into totals | blocks | — | — | $1k–$4k | — |
| $3,420 | |||||||
Pre-passage engine service on the Yanmar 4JH3E: impeller, belts, all coolant and fuel hose, filters, valve clearances, exhaust elbow inspection and mount inspection | $3,800 $0$13k | 90%$3,420 weighted into totals | blocks | — | — | $2k–$7k | — |
| $1,500 | |||||||
Cutless bearing, shaft seal service and shaft alignment at the survey haulout | $2,000 $0$8k | 75%$1,500 weighted into totals | blocks | — | — | $1k–$4k | — |
| $1,050 | |||||||
Renew fuel hose, fittings and primary filtration; draw a tank sample and polish the fuel | $1,400 $0$6k | 75%$1,050 weighted into totals | blocks | — | — | $600–$3k | — |
| $1,200 | |||||||
Hydraulic steering fluid change, bleed and pressure test, and fit a bypass valve to the cylinder so the emergency tiller is usable | $1,500 $0$6k | 80%$1,200 weighted into totals | blocks | — | — | $700–$3k | — |
| $2,240 | |||||||
Bottom paint: prep and two coats of antifouling at the survey haulout | $3,200 $0$11k | 70%$2,240 weighted into totals | — | — | — | $2k–$6k | — |
| $960 | |||||||
Service and rebuild all winches, replace worn pawls and springs | $1,200 $0$5k | 80%$960 weighted into totals | — | — | — | $600–$3k | — |
| $2,040 | |||||||
Exercise, service and re-grease all seacocks at the survey haulout; replace individual valves found seized | $2,400 $0$9k | 85%$2,040 weighted into totals | blocks | — | — | $1k–$5k | — |
| $425 | |||||||
LPG system inspection, pressure and leak test of the propane installation | $500 $0$2k | 85%$425 weighted into totals | blocks | — | — | $250–$900 | — |
| $2,625 | |||||||
Bimini over the centre cockpit with a connector to the existing hard dodger | $3,500 $0$12k | 75%$2,625 weighted into totals | — | — | — | $2k–$7k | — |