Boats

Sign in
All boats

2001 Tayana Vancouver 42 "KI", Long Beach, California

14/21
2001 Tayana Vancouver 42 "KI"View listing

Ability analysis

Everything below is costed to cross the Pacific.

Specifications

All-in, cruising

—

not analysed

All-in, offshore

$236k–$264k

offer + full refit

Length

41.75 ft

Draft

5.83 ft

Capability

7.0 · 7.0

cruising · offshore, of 10

Capability is scored for both standards from the same design research, re-weighted. The money is not: a coastal refit has to be costed on its own, which is why it can read “not analysed” above while the score beside it is real.

Assistant's read — an opinion, not a source

  • KI remains the strongest monohull candidate in the fleet for the actual Pacific crossing: conservative ratios, encapsulated ballast, skeg-hung rudder, cutter rig, post-1992 vinylester hull, molded non-skid instead of the model's usual teak deck, and a unusually complete 2021-22 cruising refit.
  • The main revisions from the prior payload are: the draft gate is re-confirmed at 5ft 10in; the listing now directly supports a high-capacity belt on the 160A alternator, a vented propane locker and remote stove shutoff, and fuel tanks having been polished/cleaned; the current tank itemisation is 94gal fuel and 120gal water despite model/spec fields of 120gal and 150gal; conditional generic-gear zeroes for the autopilot, AIS, VHF handheld, NMEA backbone, Starlink Mini, solar controllers and emergency-steering package have been removed where the listing does not prove a serviceable catalogue-equivalent item.
  • The previous cost line for delivery from Long Beach has been moved out of costItems into seakeeping.delivery to avoid double-counting, but it is still costed.

Costed to cross the Pacific.

Finance

Offer$139,000
$69kasking $139k

At the asking price. Drag down to model a lower offer.

Sign in to change the offer.

Likely refit cost
$96,658

each line × its odds

Holding / yr
$16,142

slip $8k · ins $2k · tax $2k

All-in departure cost
$236k–$264k

offer + full refit

Worst case, every line landing in full: $124,628. Planning figure is the likely cost above; this is the tail, not the expectation.

Resale

The gross figure flatters: Australian duty and GST fall due on sale, and brokerage is charged on the sale price.

Expected resale

$164k

in Australia, gross

AU duty + GST

$22k

on sale, not arrival

Brokerage

$16k

on the sale price

Recouped value

$126k

what actually comes back

Taxes and brokerage, total

$54k

incl. $15k CA use · $2k CA property/yr

All-in after resale

$176k–$196k

cash gone once sold in AU

DIY savings

$46 an hour of your own time, blended. Not folded into any total above — every figure on this page assumes the yard does the work.

Labour saved

$27k

across 15 jobs · $6k more must go to a pro

Hours of your time

588 hrs

about 37 weekends

Where the money goes

  • Purchase $139k
  • Use tax $15k
  • Refit $78k
  • Risk $27k
  • Unknowns $23k
  • Holding $22k
  • AU import $22k
Purchase
$139,000

contemplated offer

CA use tax
$14,595
Required refit
$57k–$118k

20 items still unpriced

Risk, expected
$27,025

15 open · $254k if all hit

Unknown reserve
$22,620

systems not yet looked at

Holding
$21,522

slip $10k · insurance $3k · tax $2k

Cash to Pacific-ready
$254k–$365k
All-in by Australia
$287k–$398k
Net after resale
$176k–$196k

assumes $164k resale

Where to open

Suggested opening offer$76,645

Asking price less $62,355 — the negotiable share of $76,900 in disclosed and suspected defects plus $27,025 of weighted risk. Offshore upgrades are excluded on purpose: a watermaker and a liferaft are your ambition, not the seller's problem, and the next buyer wanting a Bay daysailer would pay near the ask.

Negotiable defects
$62,355

from $76,900 of defect work

Weighted risk
$27,025

15 still open

Max at high case
$43,318

the ceiling, never an offer

Schedule

A boat that cannot be ready is not cheaper, it is a year late.

ready in 33 weeks45 weeks spare

How much of this is actually known

A boat priced from guesses is a different risk from one priced from quotes, at the same total.

Costs actually quoted0%
Systems assessed0%