Boats

Sign in
All boats

2002 Caliber 40 LRC "HARRIET TUBMAN", Anacortes, WA 98221

17/21
2002 Caliber 40 LRC "HARRIET TUBMAN"View listing

Ability analysis

Everything below is costed to cross the Pacific.

Specifications

All-in, cruising

—

not analysed

All-in, offshore

$250k–$267k

offer + full refit

Length

40.92 ft

Draft

5.08 ft

Capability

7.2 · 7.2

cruising · offshore, of 10

Capability is scored for both standards from the same design research, re-weighted. The money is not: a coastal refit has to be costed on its own, which is why it can read “not analysed” above while the score beside it is real.

ItemCost estimateProbabilityPriorityProductWhat and whyRangeNotes
$14,250

Replace standing rigging and service chainplate penetrations

$19,000

$0$47k
75%$14,250
weighted into totals
blocks—

—

$14k–$26k

The listing is silent on age. Unless invoices prove a recent replacement, a 2002 charter boat should be budgeted as overdue for offshore use.

$4,225

Renew charter-worn running rigging and service furling systems

$6,500

$0$18k
65%$4,225
weighted into totals
blocks—

—

$4k–$10k

No line ages are stated; the hull manual itself warns that jib-sheet stoppers tend to fray lines, and the boat remains in bareboat charter service.

$13,200

Replace aged or charter-stretched mainsail and 130% genoa

$22,000

$0$54k
60%$13,200
weighted into totals
blocks—

—

$15k–$30k

The listing identifies the sail types but omits ages, cloth, maker, recuts and condition; active charter use increases stretch and UV exposure.

$4,160

Bring 2,874-hour Yanmar baseline maintenance current

$5,200

$0$18k
80%$4,160
weighted into totals
blocks—

—

$3k–$10k

No service history is published. At minimum, offshore departure requires documented fluids, filters, belts, impeller, valve clearance, mounts, hoses, heat exchanger and exhaust-elbow status.

$4,100

Repair nonfunctioning freshwater-tank level indication

$1,400

$0$7k
100%
certain
——

—

$500–$4k

The hull-specific operations manual explicitly states that the freshwater-tank gauge is not functioning.

Inspect and remediate holding-tank and integral-tank venting

$3,000

$0$13k
90%$2,700
weighted into totals
blocks—

—

$1k–$7k

Practical Sailor documents vent-screen blockage causing tank/hull delamination on sisterships, and this hull's own manual warns that a clogged vent can burst the tank.